Shanghai container terminal LTD  

Products
Solutions
 

ODIN310 application case
--Shanghai container terminal LTD

----Shanghai container terminal LTD, having three container docks£¬has setup network system£¬but also can not meet the increasing requirement of charge and discharge. By the limited of adding vehicles or expanding stack room, only adopting advanced dispatching management system can resolve this problem.

----At the second quarter of this year, this company has raised work efficiency at least 50% after selecting ODIN310 OF neolink Communications.

----According to the features of container dock; large data quantity£¬relatively fixed routes between dock and stack£¬much repeated commands£¬scattered stacks position£¬flexibility task etc, a special Port&Dock synthetical dispatching management system is designed in order to raise work efficiency of Port&Dock.

----ODIN310 utilizes MPT-1327 digital signal cell technology£¬priority of connecting Port&Dock task assignment & management system and ODIN310 system£¬one hot one standby transmission passage and auto fault switch£¬adding error checking¡¢correction¡¢repeat command function in data transmission process£¬realize high work efficiency and constantly£¬raise charge and discharge capability£¬meet the requirement of 24 hrs non-interrupted work.

----System consists of radio communication platform¡¢task data management unit¡¢carrier two-way data display. Radio communication platform adopts high liability radio¡¢odin310 professional controller£»task data management unit consists of dispatching communication terminals and task dispatching terminals and software.

----Charge and discharge task diagram Application ODIN310£¬it can make container to receive command anytime anywhere when working£¬try to reduce the empty driving time between dock and stack£¬raise charge and discharge capibility without adding vehicles or expanging stack room, realize informationize work.

System features
¡¤ Strong constantly£¬max data transmission quantity£º60s/3s/time*120 bytes/time=2400 bytes/min
¡¤ high liability£¬ error checking¡¢correction¡¢repeating command function
¡¤ software and hardware comply with standard of opening system£¬connection with different application system.
¡¤ System Upgrade in vertical and crosswise
¡¤ System guarantee 24hrs non-interrupted work£¬maintains time no more than 72 hrs
¡¤ Considering out ground electronics and magnetic environment interference£¬ raise communication success probability
¡¤ Data transmission is prior to voice
¡¤ 240*64 super layout£¬max 60 Chinese words